  Assembly            
  Drawing Drawing Size to Cut     Total Length  
Description Designation Size Inches Material Qty Inches notes
 Base A 16 5/8 19 3/8 2" pipe 4 77 1/2  
 Base B 6 5/8 9 3/8 2" pipe 4 37 1/2  
 Base C 14 3/4 17 1/2 2" pipe 2 35     
 Base D 30 3/4 33 1/2 2" pipe 1 33 1/2  
 Mattress Platform E 9 3/4 12 1/2 2" pipe 4 50     
 Mattress Platform B 6 5/8 9 3/8 2" pipe 4 37 1/2  
 Mattress Platform C 14 3/4 17 1/2 2" pipe 2 35     
 Mattress Platform G 16 3/4 19 1/2 2" pipe 2 39     
 Mattress Platform H 1 5/8 4 3/8 2" pipe 4 17 1/2  
 Mattress Platform I 1 3/4 4 1/2 2" pipe 4 18     
 Mattress Platform J 39    41 3/4 2" pipe 6 250 1/2   main verticals cut to match ladder length
 Mattress Platform K 38 1/2 41 1/4 2" pipe 4 165     mattress bars
 Ladder M 5 3/8 8 1/8 2" pipe 8 65     ladder verticals
 Ladder C 14 3/4 17 1/2 2" pipe 3 52 1/2  ladder rungs
          913 1/2  inches
    total: 2" pipe   77    feet
             
 Railing M 17 1/4 19 7/8 1.5" pipe 8 159     
 Railing N 7 1/4 9 7/8 1.5" pipe 8 79     
 Railing O 15 3/8 18    1.5" pipe 2 36     
 Railing P 31 3/8 34    1.5" pipe 4 136     
 Railing Q 9    11 5/8 1.5" pipe 16 186    railing verticals (not on drawing)
             
          596     inches
    total: 1.5" pipe   50     feet (rounded up)
             